皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【单选题】
In the early days of nuclear power, the United States make money on it. But today opponents (反对者 ) have so complicated its development that no nuclear plants have been ordered or built here in 12 years. The greatest fear of nuclear power opponents has always been a reactor "meltdown". Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But don't expect them even on U. S. shores unless things change in Washington. The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway. A case in point is the Shoreham plant on New York's Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60's. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years. Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New York's public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. I'oday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting. 2. What has made the procedure for licensing nuclear power plants a bad dream?
A.
he inefficiency of the Nuclear Regulation Commission.
B.
The enormous cost of construction and operation.
C.
The length of time it takes to make investigations.
D.
The objection of the opponents of nuclear power.
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】某债券面值为1000元,票面年利率为12%,期限6年,每半年支付一次利息。若市场利率为10%,则债券的价值
A.
高于1000元
B.
低于1000元
C.
等于1000元
D.
无法计算
【判断题】“智、信、仁、勇、严”是将帅的基本素质。
A.
正确
B.
错误
【单选题】某债券面值为1000元,票面年利率为10%,期限5年,每半年支付一次利息。若市场利率为10%,则其发行时的价格将(    )。
A.
高于1000元    
B.
低于1000元
C.
等于1000元    
D.
无法计算
【单选题】某债券面值为1000元,票面利率为10%,期限5年,每半年付息一次,若市场利率为15%,则其发行时价格为( )。
A.
低于1000元
B.
等于1000元
C.
高于1000元
D.
无法计算
【单选题】某债券面值为1000元,息票利率为10%,市场利率也为10%,期限5年,每年付息一次,该债券的发行价格()。
A.
高于面值
B.
等于面值
C.
低于面值
D.
无法判断
【简答题】在无向图中,若从顶点vi到顶点vj之间有______ 存在,则称vi与vj是连通的。
【单选题】某债券面值1000元,票面年利率为5%,期限10年,每年支付一次利息,若市场率为6%,则该债券的价值将( )债券面值。
A.
大于
B.
小于
C.
等于
D.
无法确定
【判断题】法律所体现的统治阶级的意志是每个统治者个人意志的相加。
A.
正确
B.
错误
【单选题】在学生表中,如果要找出女同学的记录,所采用的关系是( )。
A.
选择
B.
投影
C.
连接
D.
自然连接
【单选题】某债券面值为1000元,息票利率为10%,市场利率为8%,期限5年,每半年付息一次,该债券的发行价格应为()。
A.
1079.85元
B.
1073.16元
C.
1000元
D.
1486.65元
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题