Terminal pay must ensure that seal oil loading, because there is no driving force, oil and gas recovery unit of oil and gas in the process of volatile oil and gas by the tanker refueling hold space to reduce the extrusion pressure through the outer pipe pressure into the entry of the oil and gas recovery unit, the pressure itself is only a few hundred MPa, if crane tube sealing is not good, may lead to oil and gas in the process of loading were leaked, cannot enter the recovery unit, so as to complete recovery.