【单选题】住宿经营者未能按照旅游服务合同约定提供服务的,应当旅游者提供不低于原定标准的住宿服务,因此增加的费用由()承担。
【单选题】With mixed costs, the fixed cost element is viewed as the ________ and the variable cost element is viewed as the ________.
A.
step cost; cost of capacity
B.
cost of capacity; incremental cost of using capacity
C.
variable cost; cost of capacity
【简答题】中国民间传说人物“孟姜女”的姓氏是()?
【单选题】An increase in total variable cost usually indicates:
A.
a. the cost-driver activity level is decreasing
B.
b. the cost-driver activity level is increasing
C.
c. variable costs per unit is decreasing
D.
d. variable costs per unit is increasing
【判断题】( )工序设计包括确定加工余量,计算工序尺寸及公差确定切削用量及工时定额等。
【单选题】工序内容设计包括各工序的 ( ) 和刀具、夹具、量具和辅具。确定加工余量,计算工序尺寸及公差确定切削用量及工时定额等。
【单选题】住宿经营者未能按照旅游服务合同约定提供服务的,应当为旅游者提供不低于原定标准的住宿服务,因此增加的费用由()承担。