【单选题】招标工作的正确顺序为( )。 ①成立招标小组;②发出投标邀请书;③编制招标文件;④编制标底;⑤发放招标文件;⑥招标答疑;⑦组织现场踏勘;⑧接收投标文件;⑨开标;⑩确定中标单位;(11)评标;(12)签订承发包合同;(13)发出中标通知书。
A.
①②③④⑤⑥⑦⑧⑨⑩(11)(12)(13)
B.
①③④②⑤⑧⑦⑥⑨(11)⑩(12)(13)
C.
①③④⑤②⑦⑥⑧⑨(11)⑩(13)(12)
D.
①③④⑤②⑦⑥⑧(11)⑨⑩(12)(13)
【单选题】Please report the amount of diesel oil remaining on board. 02010278
A.
The quantity of fuel oil board ship should be reported.
B.
The quantity diesel oil board ship should be reported.
C.
The quantity of lube oil board ship should be reported.
D.
The quantity of gas oil board ship should be reported.
【单选题】患者,女,48岁。血栓性外痔,为其准备热水坐浴的水温是
【单选题】A person on a fixed or floating platform. engaged in oil exploration MAY discharge food waste into the sea when the distance from the nearest land is at least
【单选题】( )的主要作用是为投标人编制投标文件提供固定的格式和编排顺序,以规范投标文件的编制,同时便于评标委员会评标。
【简答题】用冠词a,an或the填空。 Can you see picture on desk ?
【单选题】The remaining oil in the lubricating pipes and ducts should be blown out with _____.
【单选题】()provides strength and storage space for fuel,lubricating oil,fresh water,salt(ballast)water and potable water.