皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【简答题】
America’s greatest technological achievement, the Hoover Dam, now has a companion piece, a bridge held up by the longest arch in the Western Hemisphere(半球). The Mike O’Callaghan-Pat Tillman Memorial Bridge, which opened this month and connects the U.S. states of Arizona and Nevada, crosses the vast chasm(峡谷)890 feet above the Colorado River that is controlled by the dam. The striking 1,900-foot-long structure will improve traffic in the region and help protect the dam from being destroyed. It is the seventh highest bridge in the world, behind four in China, one in Papua New Guinea and one in the US state of Colorado. “The Hoover Dam is the greatest civil engineering achievement in America’s history,” said the bridge project manager Dave Zanatell. “Our goal was not to outdo or outshine it. Our goal was to, in a respectful way, do something that would be great for our generation and that would stand besides Hoover Dam in a respectful and quality way that would become a part of Hoover’s legacy(遗产).” Just as the Hoover Dam was built in the heart of the Great Depression(大萧条)and was seen as an example of the nation’s can-do spirit, some hope this project can also provide some uplift . The bridge is surprising: at 1,050 feet, its support arch holds up a roadway that lies on 300-foot-long concrete pillars(柱子), some of the tallest in the world. It contains 16 million pounds of steel. The idea of the bridge came into being in the 1960s because the top of the Hoover Dam has been a narrow two-lane road that is the fastest route from Arizona to Las Vegas and then the Pacific Northwest and Canada. Access to the dam from each direction is a dangerously winding route, but massive trucks and passenger vehicles shared it for decades. During the day, when thousands of tourists travel to the dam from Las Vegas three times as many accidents as on a normal road will happen. The bridge has a sidewalk on the side facing the dam. The wall on both sides is 54 inches high, so walkers can take photos there. 小题1:Which of the following is true of the Hoover Dam? A.It was completed recently. B.It was built during the hard times. C.It has the longest arch. D.It’s the seventh highest dam in the world. 小题2:What is one of the purposes of building the bridge? A.To protect the dam. B.To save the cultures. C.To outdo the dam. D.To develop the tourism. 小题3:The underlined word “uplift” in Paragraph 4 means _____. A.lift of the heavy object B.support in money C.spiritual encouragement D.instruction in technology 小题4:Which of the followings shows the right position of the bridge and dam? 小题5:The text is mainly about ______. A.the Hoover Dam B.American western development C.a tour along the Colorado River D.a recently built bridge
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【简答题】车间管理人员的社会保险费应计入当期管理费用。( )
【判断题】车间管理人员的社会保险费应计入当期管理费用中。
A.
正确
B.
错误
【单选题】顾客满意的含义是( ):
A.
没有顾客投诉
B.
顾客对其要求已被满足的程度的感受
C.
没有顾客抱怨
D.
产品全合格
【单选题】使用下列哪项属性,可以对文字或图像进行旋转、缩放、倾斜和移动的变形处理。()
A.
text-algin属性
B.
display属性
C.
transform属性
D.
font-adjust属性
【简答题】根据如下分段函数,输入x的值,输出对应的y值。 注意: 1. 程序的最后必须输出一个回车换行。 2. 语言选DEV C++。 输入格式: 输入x的值。 输出格式: 输出对应的y值,小数点后保留3位小数。 输入样例: 10.5 输出样例: 27.083
【判断题】车间管理人员的社会保险费应当计入管理费用。 ( )
A.
正确
B.
错误
【单选题】Is the man's son badly ill?
A.
Yes, he is very iii.
B.
No, he is very common.
C.
Yes, but he can go home.
【多选题】下列选项中,客户投诉对于企业的意义是 ( )
A.
使企业再次赢得顾客
B.
使企业及时发现产品或服务的失误
C.
开创新的商机
D.
可以为企业建立和巩固良好形象提供机会
E.
为企业增加了成本
【判断题】车间管理人员的社会保险费应计入当期管理费用( )。
A.
正确
B.
错误
【单选题】朱兰博士认为“质量”的一种理解是免于不良,亦即没有那些需要返工或导致现场失效、顾客投诉等的差错。从这个意义上说,提高质量会导致成本的()。
A.
增加
B.
降低
C.
很难说,具体情况具体分析
D.
波动
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题