【简答题】
"Taxi"! I called. A taxi stopped near me and I asked, "Can you take me to the London Airport, please?" "Certainly, sir," said the driver. I got in and sat down. "Please hurry," I said, "I must catch a plane at 11:10." Then I saw a bag on the seat. "There is a bag on the seat. Is it yours?" I said. "A bag, sir?" the driver said, "No, it's not mine. May I have a look at it?" I gave the bag to the driver. "It's an old man's. He was my last passenger," the driver said. "I must take it to the police station." The taxi stopped at the airport and I got out. Suddenly another taxi stopped at the airport and an old man got out. He came to us quickly. "Where is my bag?" "Oh, it's you, sir," the driver said, "I have it here." "Thank you very much," the old man said. "I followed you all the way to the airport."
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】如图所示电路中,耦合电感元件的等效感抗∣Z ab ∣为()。
A.
0.5Ω
B.
1.5Ω
C.
2.5Ω
【单选题】如图所示电路中,耦合电感元件的等效感抗∣Z ab ∣为()。
A.
0.5Ω
B.
1.5Ω
C.
2.5Ω
【判断题】岩石的吸水率指在规定条件下,岩石试样的最大吸水质量与吸水饱和岩石质量之比。
A.
正确
B.
错误
【简答题】隐蔽工程在隐蔽前,应由( )通知有关单位进行验收,并形成验收文件。
【单选题】如图 10-4所示电路中,耦合电感元件的等效感抗 为( )
A.
0.5 W
B.
1.5 W
C.
2.5 W
D.
3.5 W
【单选题】隐蔽工程在隐蔽前应
A.
由施工单位通知有关单位进行验收,并应形成验收文件。
B.
由施工单位通知有关单位进行验收,不需形成验收文件。
C.
施工单位自行验收,并应形成验收文件。
D.
施工单位自行验收,不需形成验收文件。
【判断题】岩石的吸水率指在规定条件下,岩石试样的最大吸水质量与吸水饱和岩石质量之比。
A.
正确
B.
错误
【判断题】隐蔽工程的验收应由施工单位准备好自检记录,在隐蔽验收日提前48h通知相关单位验收;未经隐蔽工程验收合格,不得进行下道工序的施工。 ( )
A.
正确
B.
错误
【单选题】《建筑工程施工质量验收统一标准》(GB50300-2013)规定,隐蔽工程在隐蔽前应由( )通知有关单位进行验收,并应形成验收文件。
A.
建设单位
B.
施工单位
C.
监理单位
D.
设计单位
【单选题】— What you said at the meeting hurt me badly. —Sorry. But____________.
A.
I didn’t mean it
B.
I didn’t mean to
C.
I don’t mean it
D.
I don’t mean so
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题