皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【单选题】
6 things you do not know about Gregorian calendar1. The original goal of the Gregorian calendarwas to change the date of Easter.In 1582, when Pope Gregory XIII introduced his Gregorian calendar, Europe adhered to the Julian calendar, first implemented by Julius Caesar in 46 B.C. Since the Roman emperor’s system miscalculated the length of the solar year by 11 minutes, the calendar had since fallen out of sync with the seasons. This concerned Gregory because it meant that Easter, traditionally observed on March 21, fell further away from the spring equinox with each passing year.2. Leap years don’t really occur every four years in the Gregorian calendar.The Julian calendar included an extra day in February every four years. But Aloysus Lilius, the Italian scientist who developed the system Pope Gregory would unveil in 1582, realized that the addition of so many days made the calendar slightly too long. He devised a variation that adds leap days in years divisible by four, unless the year is also divisible by 100. If the year is also divisible by 400, a leap day is added regardless. While this formula may sound confusing, it did resolve the lag created by Caesar’s earlier scheme—almost.3. The Gregorian calendar differs from the solar year by 26 seconds per year.Despite Lilius’ ingenious method for syncing the calendar with the seasons, his system is still off by 26 seconds. As a result, in the years since Gregory introduced his calendar in 1582, a discrepancy of several hours has arisen. By the year 4909, the Gregorian calendar will be a full day ahead of the solar year.4. Some Protestants viewed the Gregorian calendar as a Catholic plot.Though Pope Gregory’s papal bull reforming the calendar had no power beyond the Catholic Church, Catholic countries—including Spain, Portugal and Italy—swiftly adopted the new system for their civil affairs. European Protestants, however, largely rejected the change because of its ties to the papacy, fearing it was an attempt to silence their movement. It wasn’t until 1700 that Protestant Germany switched over, and England held out until 1752. Orthodox countries clung to the Julian calendar until even later, and their national churches have never embraced Gregory’s reforms.5. Britain’s adoption of the Gregorian calendar sparked riots and protest—maybe.According to some accounts, English citizens did not react kindly after an act of Parliament advanced the calendar overnight from September 2 to September 14, 1752. Rioters supposedly took to the streets, demanding that the government “give us our 11 days.” However, most historians now believe that these protests never occurred or were greatly exaggerated. On the other side of the Atlantic, meanwhile, Benjamin Franklin welcomed the change, writing, “It is pleasant for an old man to be able to go to bed on September 2, and not have to get up until September 14.”6. Before the Gregorian calendar’s adoption, the English new year began on March 25, or Lady Day.Julius Caesar’s calendar reform of 46 B.C. instituted January 1 as the first of the year. During the Middle Ages, however, European countries replaced it with days that carried greater religious significance, such as December 25 (the anniversary of Jesus’ birth) and March 25 (the Feast of the Annunciation). The latter, known as Lady Day because it celebrates the Virgin Mary, marked the beginning of the year in Britain until January 1, 1752.11.According to Aloysus Lilius’improvement on calendar system, which one is NOT true?
A.
To add extra days into February would make the calendar unreasonably long.
B.
Every year divisible by four contains leap days
C.
If a year is divisible by 100 and also divisible by 400, whether a leap day is added does not really matter.
D.
Lilius’ variation did resolve the lag created by Caesar’s earlier scheme
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【简答题】在横线上填上“>”、“<”或“=”. 8.7______8.7÷0.128.7______8.7×0.128.7______8.7÷b(b≥1)
【多选题】单位工程施工组织设计的编制依据主要有( )
A.
建设单位的意图和要求
B.
资源配置情况
C.
有关的标准、规范和法律
D.
计划文件
E.
工程的施工图纸及标准图
【单选题】1R的照射量对应空气的吸收剂量是
A.
8.7×10-1Gy
B.
8.7×10-2Gy
C.
8.7×10-3Gy
D.
8.7×10-4Gy
E.
8.7×10-5Gy
【单选题】关于遗传性血小板功能异常性疾病,错误的是
A.
血小板无力症患者对瑞斯托霉素诱导的血小板凝集反应良好
B.
巨血小板综合征患者对瑞斯托霉素诱导的血小板凝集无反应
C.
致密颗粒缺陷症又称为灰色血小板综合征
D.
主要表现为皮肤、黏膜出血,在手术、创伤和分娩后出血加重
E.
多数为常染色体隐性遗传
【单选题】单位工程施工组织设计的编制依据包括( )。
A.
施工单位原有的施工组织设计
B.
建设单位的意图和要求
C.
流水施工的需要
D.
已批准工程的施工图纸
【多选题】多选 单位工程施工组织设计的编制依据有( )。
A.
设计文件
B.
施工现场条件
C.
建设单位可提供的条件
D.
施工合同
【多选题】患者,男,56岁,高血压5年,3个月前突然剧烈头痛、呕吐送至医院。查体:嗜睡,血压160/105mmHg,水平性眼球震颤,构音不良,四肢肌力正常,右手指鼻试验不准,双侧下肢腱反射正常,双侧Babinski征阳性。该患者经康复训练后,表现出典型的偏瘫步态,偏瘫侧下肢表现为()
A.
髋关节伸展、内收、内旋
B.
髋关节伸展、外展、外旋
C.
髋关节屈曲、外展、内旋
D.
踝关节跖屈、内翻
E.
踝关节背屈、内翻
F.
踝关节背屈、外翻
G.
膝关节屈曲
H.
膝关节伸展
【单选题】1R(伦琴)的照射量对应空气的吸收剂量是
A.
8.7×10-3By
B.
8.7×10 Gy
C.
8.7×102Gy
D.
8.7×103Gy
E.
8.7×104Gy
【单选题】1R的照射量对应空气的吸收剂量是
A.
8.7×10 Gy
B.
8.7×10 Gy
C.
8.7×10 Gy
D.
8.7×10 Gy
E.
8.7×10 Gy
【单选题】1R(伦琴)的照射量对应空气的吸收剂量是
A.
8.7×10-3Gy
B.
8.7×10Cy
C.
8.7×103Gy
D.
8.7×103Cy
E.
8.7×104Gy
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题