When the adsorption method oil and gas recovery device is added to the oil depot, the work includes ()
A.
Transform the oil generator crane tube to provide gas source for oil and gas recovery device
B.
Provide power supply for oil and gas recovery control cabinet and make wiring preparation
C.
Do a good job of wire embedding of instrument wires from the control room to the site
D.
Lay the foundation for the device, and ensure that the device can be directly positioned and installed on site
E.
Connect oil inlet and outlet pipelines with oil tanks
F.
Complete the installation of electrostatic grounding bar